With ever present issues with steel poles rusting and the concern with fall downs Manitoba Hydro decided to start utilizing direct buried concrete. The have been using concrete for almost 15 years now with satisfactory results. Concrete poles do not rust – do not require a base to be installed and come with a life time warranty.